# Change Navigation Checklist
|
||||
|
||||
<critical>This checklist is executed as part of: {project-root}/bmad/bmm/workflows/4-implementation/correct-course/workflow.yaml</critical>
|
||||
<critical>Work through each section systematically with the user, recording findings and impacts</critical>
|
||||
|
||||
<checklist>
|
||||
|
||||
<section n="1" title="Understand the Trigger and Context">
|
||||
|
||||
<check-item id="1.1">
|
||||
<prompt>Identify the triggering story that revealed this issue</prompt>
|
||||
<action>Document story ID and brief description</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="1.2">
|
||||
<prompt>Define the core problem precisely</prompt>
|
||||
<action>Categorize issue type:</action>
|
||||
- Technical limitation discovered during implementation
|
||||
- New requirement emerged from stakeholders
|
||||
- Misunderstanding of original requirements
|
||||
- Strategic pivot or market change
|
||||
- Failed approach requiring different solution
|
||||
<action>Write clear problem statement</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="1.3">
|
||||
<prompt>Assess initial impact and gather supporting evidence</prompt>
|
||||
<action>Collect concrete examples, error messages, stakeholder feedback, or technical constraints</action>
|
||||
<action>Document evidence for later reference</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<halt-condition>
|
||||
<check>If trigger is unclear: "Cannot proceed without understanding what caused the need for change"</check>
|
||||
<check>If no evidence provided: "Need concrete evidence or examples of the issue before analyzing impact"</check>
|
||||
</halt-condition>
|
||||
|
||||
</section>
|
||||
|
||||
<section n="2" title="Epic Impact Assessment">
|
||||
|
||||
<check-item id="2.1">
|
||||
<prompt>Evaluate current epic containing the trigger story</prompt>
|
||||
<action>Can this epic still be completed as originally planned?</action>
|
||||
<action>If no, what modifications are needed?</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="2.2">
|
||||
<prompt>Determine required epic-level changes</prompt>
|
||||
<action>Check each scenario:</action>
|
||||
- Modify existing epic scope or acceptance criteria
|
||||
- Add new epic to address the issue
|
||||
- Remove or defer epic that's no longer viable
|
||||
- Completely redefine epic based on new understanding
|
||||
<action>Document specific epic changes needed</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="2.3">
|
||||
<prompt>Review all remaining planned epics for required changes</prompt>
|
||||
<action>Check each future epic for impact</action>
|
||||
<action>Identify dependencies that may be affected</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="2.4">
|
||||
<prompt>Check if issue invalidates future epics or necessitates new ones</prompt>
|
||||
<action>Does this change make any planned epics obsolete?</action>
|
||||
<action>Are new epics needed to address gaps created by this change?</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="2.5">
|
||||
<prompt>Consider if epic order or priority should change</prompt>
|
||||
<action>Should epics be resequenced based on this issue?</action>
|
||||
<action>Do priorities need adjustment?</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
</section>
|
||||
|
||||
<section n="3" title="Artifact Conflict and Impact Analysis">
|
||||
|
||||
<check-item id="3.1">
|
||||
<prompt>Check PRD for conflicts</prompt>
|
||||
<action>Does issue conflict with core PRD goals or objectives?</action>
|
||||
<action>Do requirements need modification, addition, or removal?</action>
|
||||
<action>Is the defined MVP still achievable or does scope need adjustment?</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="3.2">
|
||||
<prompt>Review Architecture document for conflicts</prompt>
|
||||
<action>Check each area for impact:</action>
|
||||
- System components and their interactions
|
||||
- Architectural patterns and design decisions
|
||||
- Technology stack choices
|
||||
- Data models and schemas
|
||||
- API designs and contracts
|
||||
- Integration points
|
||||
<action>Document specific architecture sections requiring updates</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="3.3">
|
||||
<prompt>Examine UI/UX specifications for conflicts</prompt>
|
||||
<action>Check for impact on:</action>
|
||||
- User interface components
|
||||
- User flows and journeys
|
||||
- Wireframes or mockups
|
||||
- Interaction patterns
|
||||
- Accessibility considerations
|
||||
<action>Note specific UI/UX sections needing revision</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="3.4">
|
||||
<prompt>Consider impact on other artifacts</prompt>
|
||||
<action>Review additional artifacts for impact:</action>
|
||||
- Deployment scripts
|
||||
- Infrastructure as Code (IaC)
|
||||
- Monitoring and observability setup
|
||||
- Testing strategies
|
||||
- Documentation
|
||||
- CI/CD pipelines
|
||||
<action>Document any secondary artifacts requiring updates</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
</section>
|
||||
|
||||
<section n="4" title="Path Forward Evaluation">
|
||||
|
||||
<check-item id="4.1">
|
||||
<prompt>Evaluate Option 1: Direct Adjustment</prompt>
|
||||
<action>Can the issue be addressed by modifying existing stories?</action>
|
||||
<action>Can new stories be added within the current epic structure?</action>
|
||||
<action>Would this approach maintain project timeline and scope?</action>
|
||||
<action>Effort estimate: [High/Medium/Low]</action>
|
||||
<action>Risk level: [High/Medium/Low]</action>
|
||||
<status>[ ] Viable / [ ] Not viable</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="4.2">
|
||||
<prompt>Evaluate Option 2: Potential Rollback</prompt>
|
||||
<action>Would reverting recently completed stories simplify addressing this issue?</action>
|
||||
<action>Which stories would need to be rolled back?</action>
|
||||
<action>Is the rollback effort justified by the simplification gained?</action>
|
||||
<action>Effort estimate: [High/Medium/Low]</action>
|
||||
<action>Risk level: [High/Medium/Low]</action>
|
||||
<status>[ ] Viable / [ ] Not viable</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="4.3">
|
||||
<prompt>Evaluate Option 3: PRD MVP Review</prompt>
|
||||
<action>Is the original PRD MVP still achievable with this issue?</action>
|
||||
<action>Does MVP scope need to be reduced or redefined?</action>
|
||||
<action>Do core goals need modification based on new constraints?</action>
|
||||
<action>What would be deferred to post-MVP if scope is reduced?</action>
|
||||
<action>Effort estimate: [High/Medium/Low]</action>
|
||||
<action>Risk level: [High/Medium/Low]</action>
|
||||
<status>[ ] Viable / [ ] Not viable</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="4.4">
|
||||
<prompt>Select recommended path forward</prompt>
|
||||
<action>Based on analysis of all options, choose the best path</action>
|
||||
<action>Provide clear rationale considering:</action>
|
||||
- Implementation effort and timeline impact
|
||||
- Technical risk and complexity
|
||||
- Impact on team morale and momentum
|
||||
- Long-term sustainability and maintainability
|
||||
- Stakeholder expectations and business value
|
||||
<action>Selected approach: [Option 1 / Option 2 / Option 3 / Hybrid]</action>
|
||||
<action>Justification: [Document reasoning]</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
</section>
|
||||
|
||||
<section n="5" title="Sprint Change Proposal Components">
|
||||
|
||||
<check-item id="5.1">
|
||||
<prompt>Create identified issue summary</prompt>
|
||||
<action>Write clear, concise problem statement</action>
|
||||
<action>Include context about discovery and impact</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="5.2">
|
||||
<prompt>Document epic impact and artifact adjustment needs</prompt>
|
||||
<action>Summarize findings from Epic Impact Assessment (Section 2)</action>
|
||||
<action>Summarize findings from Artifact Conflict Analysis (Section 3)</action>
|
||||
<action>Be specific about what changes are needed and why</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="5.3">
|
||||
<prompt>Present recommended path forward with rationale</prompt>
|
||||
<action>Include selected approach from Section 4</action>
|
||||
<action>Provide complete justification for recommendation</action>
|
||||
<action>Address trade-offs and alternatives considered</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="5.4">
|
||||
<prompt>Define PRD MVP impact and high-level action plan</prompt>
|
||||
<action>State clearly if MVP is affected</action>
|
||||
<action>Outline major action items needed for implementation</action>
|
||||
<action>Identify dependencies and sequencing</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="5.5">
|
||||
<prompt>Establish agent handoff plan</prompt>
|
||||
<action>Identify which roles/agents will execute the changes:</action>
|
||||
- Development team (for implementation)
|
||||
- Product Owner / Scrum Master (for backlog changes)
|
||||
- Product Manager / Architect (for strategic changes)
|
||||
<action>Define responsibilities for each role</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
</section>
|
||||
|
||||
<section n="6" title="Final Review and Handoff">
|
||||
|
||||
<check-item id="6.1">
|
||||
<prompt>Review checklist completion</prompt>
|
||||
<action>Verify all applicable sections have been addressed</action>
|
||||
<action>Confirm all [Action-needed] items have been documented</action>
|
||||
<action>Ensure analysis is comprehensive and actionable</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="6.2">
|
||||
<prompt>Verify Sprint Change Proposal accuracy</prompt>
|
||||
<action>Review complete proposal for consistency and clarity</action>
|
||||
<action>Ensure all recommendations are well-supported by analysis</action>
|
||||
<action>Check that proposal is actionable and specific</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="6.3">
|
||||
<prompt>Obtain explicit user approval</prompt>
|
||||
<action>Present complete proposal to user</action>
|
||||
<action>Get clear yes/no approval for proceeding</action>
|
||||
<action>Document approval and any conditions</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<check-item id="6.4">
|
||||
<prompt>Confirm next steps and handoff plan</prompt>
|
||||
<action>Review handoff responsibilities with user</action>
|
||||
<action>Ensure all stakeholders understand their roles</action>
|
||||
<action>Confirm timeline and success criteria</action>
|
||||
<status>[ ] Done / [ ] N/A / [ ] Action-needed</status>
|
||||
</check-item>
|
||||
|
||||
<halt-condition>
|
||||
<check>If any critical section cannot be completed: "Cannot proceed to proposal without complete impact analysis"</check>
|
||||
<check>If user approval not obtained: "Must have explicit approval before implementing changes"</check>
|
||||
<check>If handoff responsibilities unclear: "Must clearly define who will execute the proposed changes"</check>
|
||||
</halt-condition>
|
||||
|
||||
</section>
|
||||
|
||||
</checklist>
|
||||
|
||||
<execution-notes>
|
||||
<note>This checklist is for SIGNIFICANT changes affecting project direction</note>
|
||||
<note>Work interactively with user - they make final decisions</note>
|
||||
<note>Be factual, not blame-oriented when analyzing issues</note>
|
||||
<note>Handle changes professionally as opportunities to improve the project</note>
|
||||
<note>Maintain conversation context throughout - this is collaborative work</note>
|
||||
</execution-notes>
|
||||
@@ -0,0 +1,190 @@
|
||||
# Correct Course - Sprint Change Management Instructions
|
||||
|
||||
<critical>The workflow execution engine is governed by: {project-root}/bmad/core/tasks/workflow.md</critical>
|
||||
<critical>You MUST have already loaded and processed: {project-root}/bmad/bmm/workflows/4-implementation/correct-course/workflow.yaml</critical>
|
||||
|
||||
<workflow>
|
||||
|
||||
<step n="1" goal="Initialize Change Navigation">
|
||||
<action>Confirm change trigger and gather user description of the issue</action>
|
||||
<action>Ask: "What specific issue or change has been identified that requires navigation?"</action>
|
||||
<action>Verify access to required project documents:</action>
|
||||
- PRD (Product Requirements Document)
|
||||
- Current Epics and Stories
|
||||
- Architecture documentation
|
||||
- UI/UX specifications
|
||||
<action>Ask user for mode preference:</action>
|
||||
- **Incremental** (recommended): Refine each edit collaboratively
|
||||
- **Batch**: Present all changes at once for review
|
||||
<action>Store mode selection for use throughout workflow</action>
|
||||
|
||||
<check>If change trigger is unclear:</check>
|
||||
<action>HALT: "Cannot navigate change without clear understanding of the triggering issue. Please provide specific details about what needs to change and why."</action>
|
||||
|
||||
<check>If core documents are unavailable:</check>
|
||||
<action>HALT: "Need access to project documents (PRD, Epics, Architecture, UI/UX) to assess change impact. Please ensure these documents are accessible."</action>
|
||||
</step>
|
||||
|
||||
<step n="2" goal="Execute Change Analysis Checklist">
|
||||
<action>Load and execute the systematic analysis from: {project-root}/bmad/bmm/workflows/4-implementation/correct-course/checklist.md</action>
|
||||
<action>Work through each checklist section interactively with the user</action>
|
||||
<action>Record status for each checklist item:</action>
|
||||
- [x] Done - Item completed successfully
|
||||
- [N/A] Skip - Item not applicable to this change
|
||||
- [!] Action-needed - Item requires attention or follow-up
|
||||
<action>Maintain running notes of findings and impacts discovered</action>
|
||||
<action>Present checklist progress after each major section</action>
|
||||
|
||||
<check>If checklist cannot be completed:</check>
|
||||
<action>Identify blocking issues and work with user to resolve before continuing</action>
|
||||
</step>
|
||||
|
||||
<step n="3" goal="Draft Specific Change Proposals">
|
||||
<action>Based on checklist findings, create explicit edit proposals for each identified artifact</action>
|
||||
|
||||
<action>For Story changes:</action>
|
||||
|
||||
- Show old → new text format
|
||||
- Include story ID and section being modified
|
||||
- Provide rationale for each change
|
||||
- Example format:
|
||||
|
||||
```
|
||||
Story: [STORY-123] User Authentication
|
||||
Section: Acceptance Criteria
|
||||
|
||||
OLD:
|
||||
- User can log in with email/password
|
||||
|
||||
NEW:
|
||||
- User can log in with email/password
|
||||
- User can enable 2FA via authenticator app
|
||||
|
||||
Rationale: Security requirement identified during implementation
|
||||
```
|
||||
|
||||
<action>For PRD modifications:</action>
|
||||
|
||||
- Specify exact sections to update
|
||||
- Show current content and proposed changes
|
||||
- Explain impact on MVP scope and requirements
|
||||
|
||||
<action>For Architecture changes:</action>
|
||||
|
||||
- Identify affected components, patterns, or technology choices
|
||||
- Describe diagram updates needed
|
||||
- Note any ripple effects on other components
|
||||
|
||||
<action>For UI/UX specification updates:</action>
|
||||
|
||||
- Reference specific screens or components
|
||||
- Show wireframe or flow changes needed
|
||||
- Connect changes to user experience impact
|
||||
|
||||
<check>If mode is Incremental:</check>
|
||||
<action>Present each edit proposal individually</action>
|
||||
<ask>Review and refine this change? Options: Approve [a], Edit [e], Skip [s]</ask>
|
||||
<action>Iterate on each proposal based on user feedback</action>
|
||||
|
||||
<check>If mode is Batch:</check>
|
||||
<action>Collect all edit proposals and present together at end of step</action>
|
||||
</step>
|
||||
|
||||
<step n="4" goal="Generate Sprint Change Proposal">
|
||||
<action>Compile comprehensive Sprint Change Proposal document with following sections:</action>
|
||||
|
||||
<action>Section 1: Issue Summary</action>
|
||||
|
||||
- Clear problem statement describing what triggered the change
|
||||
- Context about when/how the issue was discovered
|
||||
- Evidence or examples demonstrating the issue
|
||||
|
||||
<action>Section 2: Impact Analysis</action>
|
||||
|
||||
- Epic Impact: Which epics are affected and how
|
||||
- Story Impact: Current and future stories requiring changes
|
||||
- Artifact Conflicts: PRD, Architecture, UI/UX documents needing updates
|
||||
- Technical Impact: Code, infrastructure, or deployment implications
|
||||
|
||||
<action>Section 3: Recommended Approach</action>
|
||||
|
||||
- Present chosen path forward from checklist evaluation:
|
||||
- Direct Adjustment: Modify/add stories within existing plan
|
||||
- Potential Rollback: Revert completed work to simplify resolution
|
||||
- MVP Review: Reduce scope or modify goals
|
||||
- Provide clear rationale for recommendation
|
||||
- Include effort estimate, risk assessment, and timeline impact
|
||||
|
||||
<action>Section 4: Detailed Change Proposals</action>
|
||||
|
||||
- Include all refined edit proposals from Step 3
|
||||
- Group by artifact type (Stories, PRD, Architecture, UI/UX)
|
||||
- Ensure each change includes before/after and justification
|
||||
|
||||
<action>Section 5: Implementation Handoff</action>
|
||||
|
||||
- Categorize change scope:
|
||||
- Minor: Direct implementation by dev team
|
||||
- Moderate: Backlog reorganization needed (PO/SM)
|
||||
- Major: Fundamental replan required (PM/Architect)
|
||||
- Specify handoff recipients and their responsibilities
|
||||
- Define success criteria for implementation
|
||||
|
||||
<action>Present complete Sprint Change Proposal to user</action>
|
||||
<ask>Review complete proposal. Continue [c] or Edit [e]?</ask>
|
||||
</step>
|
||||
|
||||
<step n="5" goal="Finalize and Route for Implementation">
|
||||
<action>Get explicit user approval for complete proposal</action>
|
||||
<ask>Do you approve this Sprint Change Proposal for implementation? (yes/no/revise)</ask>
|
||||
|
||||
<check>If no or revise:</check>
|
||||
<action>Gather specific feedback on what needs adjustment</action>
|
||||
<action>Return to appropriate step to address concerns</action>
|
||||
<goto step="3">If changes needed to edit proposals</goto>
|
||||
<goto step="4">If changes needed to overall proposal structure</goto>
|
||||
|
||||
<check>If yes:</check>
|
||||
<action>Finalize Sprint Change Proposal document</action>
|
||||
<action>Determine change scope classification:</action>
|
||||
|
||||
- **Minor**: Can be implemented directly by development team
|
||||
- **Moderate**: Requires backlog reorganization and PO/SM coordination
|
||||
- **Major**: Needs fundamental replan with PM/Architect involvement
|
||||
|
||||
<action>Provide appropriate handoff based on scope:</action>
|
||||
|
||||
<check>If Minor scope:</check>
|
||||
<action>Route to: Development team for direct implementation</action>
|
||||
<action>Deliverables: Finalized edit proposals and implementation tasks</action>
|
||||
|
||||
<check>If Moderate scope:</check>
|
||||
<action>Route to: Product Owner / Scrum Master agents</action>
|
||||
<action>Deliverables: Sprint Change Proposal + backlog reorganization plan</action>
|
||||
|
||||
<check>If Major scope:</check>
|
||||
<action>Route to: Product Manager / Solution Architect</action>
|
||||
<action>Deliverables: Complete Sprint Change Proposal + escalation notice</action>
|
||||
|
||||
<action>Confirm handoff completion and next steps with user</action>
|
||||
<action>Document handoff in workflow execution log</action>
|
||||
</step>
|
||||
|
||||
<step n="6" goal="Workflow Completion">
|
||||
<action>Summarize workflow execution:</action>
|
||||
- Issue addressed: {{change_trigger}}
|
||||
- Change scope: {{scope_classification}}
|
||||
- Artifacts modified: {{list_of_artifacts}}
|
||||
- Routed to: {{handoff_recipients}}
|
||||
|
||||
<action>Confirm all deliverables produced:</action>
|
||||
|
||||
- Sprint Change Proposal document
|
||||
- Specific edit proposals with before/after
|
||||
- Implementation handoff plan
|
||||
|
||||
<action>Report workflow completion to user</action>
|
||||
<action>Remind user of success criteria and next steps for implementation team</action>
|
||||
</step>
|
||||
|
||||
</workflow>
|
||||
@@ -0,0 +1,35 @@
|
||||
# Correct Course - Sprint Change Management Workflow
|
||||
name: "correct-course"
|
||||
description: "Navigate significant changes during sprint execution by analyzing impact, proposing solutions, and routing for implementation"
|
||||
author: "BMad Method"
|
||||
|
||||
config_source: "{project-root}/bmad/bmm/config.yaml"
|
||||
output_folder: "{config_source}:output_folder"
|
||||
user_name: "{config_source}:user_name"
|
||||
date: system-generated
|
||||
|
||||
installed_path: "{project-root}/bmad/bmm/workflows/4-implementation/correct-course"
|
||||
template: false
|
||||
instructions: "{installed_path}/instructions.md"
|
||||
validation: "{installed_path}/checklist.md"
|
||||
|
||||
mode: interactive
|
||||
|
||||
required_inputs:
|
||||
- change_trigger: "Description of the issue or change that triggered this workflow"
|
||||
- project_documents: "Access to PRD, Epics/Stories, Architecture, UI/UX specs"
|
||||
|
||||
output_artifacts:
|
||||
- sprint_change_proposal: "Comprehensive proposal documenting issue, impact, and recommended changes"
|
||||
- artifact_edits: "Specific before/after edits for affected documents"
|
||||
- handoff_plan: "Clear routing for implementation based on change scope"
|
||||
|
||||
halt_conditions:
|
||||
- "Change trigger unclear or undefined"
|
||||
- "Core project documents unavailable"
|
||||
- "Impact analysis incomplete"
|
||||
- "User approval not obtained"
|
||||
|
||||
execution_modes:
|
||||
- incremental: "Recommended - Refine each edit with user collaboration"
|
||||
- batch: "Present all changes at once for review"
|
||||