feat: transform QA agent into Test Architect with advanced quality capabilities

- Add 6 specialized quality assessment commands
  - Implement risk-based testing with scoring
  - Create quality gate system with deterministic decisions
  - Add comprehensive test design and NFR validation
  - Update documentation with stage-based workflow integration
This commit is contained in:
Murat Ozcan
2025-08-12 13:03:32 -05:00
parent b7a34b4fc6
commit 34e75bef96
68 changed files with 6616 additions and 1321 deletions

View File

@@ -8,12 +8,10 @@ PROJECT TYPE DETECTION:
First, determine the project type by checking:
1. Is this a GREENFIELD project (new from scratch)?
- Look for: New project initialization, no existing codebase references
- Check for: prd.md, architecture.md, new project setup stories
2. Is this a BROWNFIELD project (enhancing existing system)?
- Look for: References to existing codebase, enhancement/modification language
- Check for: brownfield-prd.md, brownfield-architecture.md, existing system analysis
@@ -347,7 +345,6 @@ Ask the user if they want to work through the checklist:
Generate a comprehensive validation report that adapts to project type:
1. Executive Summary
- Project type: [Greenfield/Brownfield] with [UI/No UI]
- Overall readiness (percentage)
- Go/No-Go recommendation
@@ -357,42 +354,36 @@ Generate a comprehensive validation report that adapts to project type:
2. Project-Specific Analysis
FOR GREENFIELD:
- Setup completeness
- Dependency sequencing
- MVP scope appropriateness
- Development timeline feasibility
FOR BROWNFIELD:
- Integration risk level (High/Medium/Low)
- Existing system impact assessment
- Rollback readiness
- User disruption potential
3. Risk Assessment
- Top 5 risks by severity
- Mitigation recommendations
- Timeline impact of addressing issues
- [BROWNFIELD] Specific integration risks
4. MVP Completeness
- Core features coverage
- Missing essential functionality
- Scope creep identified
- True MVP vs over-engineering
5. Implementation Readiness
- Developer clarity score (1-10)
- Ambiguous requirements count
- Missing technical details
- [BROWNFIELD] Integration point clarity
6. Recommendations
- Must-fix before development
- Should-fix for quality
- Consider for improvement